PROJECT OVERVIEW
This project involved constructing a new landfill cell for the existing landfill for the City of Grand Forks. WFW designed the control buildings, pump access structure, and forcemain to deal with the leachate that works its way down to the bottom of the landfill. WFW worked with the other design engineering firms and the client to design a finished product that would be easy to maintain and service. WFW also assisted with the construction observation and project start up.